Taller walls and heavy loads

Block and Engineered Retaining Walls

When a wall gets tall, sits beside a driveway or holds up a house pad, it needs to be designed rather than just built. Interlocking segmental blocks and reinforced, core-filled masonry are the usual answers.

Builder laying hollow concrete blocks with reinforcing bars for a retaining wall

Block & Engineered Walls at a glance

MaterialInterlocking segmental concrete blocks, or hollow masonry blocks with steel reinforcement and concrete fill
Typical usesTall cuts, driveways, house pads, pool walls, steep hills blocks
DesignEngineering input is usual; a structural engineer specifies footing, reinforcement and drainage
DrainageEngineered drainage layer, slotted pipe and a designed outlet
ApprovalsTaller and loaded walls are more likely to need a building permit; check with your council

When a gravity wall is not enough

Limestone and timber walls mostly rely on their own weight and a modest footing. That works well at garden heights. Once a wall gets taller, or has something heavy behind it, the forces grow quickly. A car on a driveway at the top of a wall, a house slab, a pool full of water, or simply a lot of saturated sand after a wet July all push much harder than a lawn.

At that point the wall should be designed by someone who has calculated those loads. In practice that usually means a structural engineer's drawing, and the builder working to it.

Two common systems

Segmental block walls

Interlocking concrete blocks are stacked dry, each course set back a little from the one below so the wall leans into the bank. Lower walls rely on the weight of the blocks. Taller ones use layers of geogrid, a strong mesh laid into the compacted backfill at set heights, so that a block of reinforced soil behind the face acts with the wall.

They suit curves and long runs, have a range of face colours and textures, and are tolerant of a little ground movement.

Reinforced masonry walls

Hollow concrete blocks are laid on a reinforced concrete footing with steel starter bars. Vertical bars run up through the block cores and the cores are filled with concrete. The face can be left plain, rendered, painted or clad in stone.

They take up little room, suit tight sites and walls that also form part of a building or a pool, and can be designed for considerable heights.

Building on Perth ground

In sand, the main challenge is keeping the excavation stable while the wall goes in, especially beside a neighbour's footing or a road. Builders may need to work in sections, bench back the cut, or provide temporary support. In the hills it is the opposite: rock and hard gravel can slow excavation, and water running down the slope needs to be intercepted before it reaches the wall.

Either way, drainage is designed in, not left to chance. Engineered walls normally include a drainage layer behind the wall, a slotted pipe at the base and a clear route for the water to leave the site.

Approvals and engineering

Taller walls and walls carrying a load are more likely to need a building permit from your local government, and that usually means engineering drawings with the application. Walls near a boundary may also raise planning questions. Confirm with your council before work starts; our council approval guide sets out the questions to ask.

When comparing quotes for an engineered wall, make sure each one is pricing the same design. A cheaper quote that leaves out the geogrid, uses a smaller footing or skips the drainage layer is not the same wall.

Ask the builder who will inspect the work during construction. On engineered walls the engineer may want to see the footing reinforcement or geogrid layers before they are covered. For lower walls where engineering is not needed, limestone or concrete sleepers are usually simpler and cheaper.

What the quote should cover

  1. Block system or masonry type, with the engineer's drawings if available
  2. Wall height, length and any steps in height along the run
  3. Footing dimensions, reinforcement and concrete strength as specified
  4. Geogrid or soil reinforcement behind segmental walls, if specified
  5. Drainage layer, pipe and discharge point
  6. Excavation, temporary support of the cut, spoil removal and compaction
  7. Engineering fees and permit lodgement, and who is responsible for each
  8. Handrails or barriers where a drop needs them

Price bands for every wall type are on the retaining wall cost page. If the wall is tall or on a boundary, read the approval guide first.

FAQs

Questions people ask before they commit

When does a retaining wall need an engineer?

As a rule of thumb, once a wall is tall, carries a load such as a driveway, building, pool or fence, or sits close to a boundary or another structure. Your council may also require engineering with a permit application. Builders will tell you if they think a design is needed.

What is a segmental retaining wall?

It is a wall built from interlocking concrete blocks that sit without mortar, each course set back slightly. Taller versions use layers of geogrid laid into the backfill to tie the ground and the wall together.

What is a core-filled block wall?

Hollow concrete blocks are laid over a reinforced footing, steel bars run up through the cores, and the cores are filled with concrete. The result is a reinforced masonry wall that can be rendered or clad.

Do tall walls need a barrier on top?

Where a wall creates a drop that someone could fall from, a balustrade or fence may be needed. The requirement depends on the height of the drop and the use of the area, so ask the builder or certifier.